{"id":1714,"date":"2026-10-02T10:17:15","date_gmt":"2026-10-02T10:17:15","guid":{"rendered":"https:\/\/zsambeksciencepark.hu\/?p=1714"},"modified":"2026-10-02T10:17:15","modified_gmt":"2026-10-02T10:17:15","slug":"mennyi-energiat-fogyaszt-egy-adatkozpont-az-ai-korszak-lathatatlan-kerdese-az-aram-es-a-hutes","status":"publish","type":"post","link":"https:\/\/zsambeksciencepark.hu\/en\/mennyi-energiat-fogyaszt-egy-adatkozpont-az-ai-korszak-lathatatlan-kerdese-az-aram-es-a-hutes\/","title":{"rendered":"How much energy does a data center consume? The invisible issue of the AI era is power and cooling"},"content":{"rendered":"<p><i>Asking a question to a chatbot or playing a video is just a click on the screen. But behind the scenes, huge data centers are operating every minute of the day. With the rise of artificial intelligence, their energy needs have become one of the most important issues in technological development.<\/i><\/p>\n<p>The world&#039;s data centers used about 485 terawatt hours of electricity in 2025. This is about ten times the total annual electricity consumption of Hungary. The rate of growth is even more telling: data center consumption increased by about 17 percent in a single year, and that of facilities specifically built on artificial intelligence by about 50 percent. Meanwhile, global electricity demand increased by only 3 percent. According to forecasts, data center consumption could double by 2030, reaching about 3 percent of total global electricity use.<\/p>\n<p>A single large data center can use as much electricity as 100,000 homes. State-of-the-art AI servers are particularly energy-hungry. A single refrigerator-sized server rack can use as much power as 65 homes combined in a few years. Where many of these facilities are concentrated, this can have a negative impact on the national energy system. In Ireland, for example, data centers account for more than a fifth of total electricity consumption.<\/p>\n<p>The majority of the energy is used by the servers and computing chips themselves, but cooling is also a significant item. Every kilowatt-hour consumed is eventually converted into heat, which must be removed or the equipment will overheat. Cooling accounts for less than a tenth of the total consumption in a modern, efficient facility. In an older, less efficient data center, however, it can be as much as a third. Traditional air cooling is increasingly insufficient with today&#039;s densely installed AI chips. That&#039;s why liquid cooling, which directs coolant directly to the processors, is becoming more common. In some systems, servers are completely immersed in a special, non-conductive liquid.<\/p>\n<p>The good news is that efficiency is improving extremely quickly. The energy demand of an AI task has decreased by up to a tenth per year in recent years, an unprecedented rate in the history of energy. The challenge is that at the same time, usage is growing even faster. More and more people are using AI, and for increasingly complex tasks.<\/p>\n<p>The solution therefore does not lie in a single technology. We need more energy-efficient chips and software, more advanced cooling systems, renewable energy sources and the use of waste heat. A good example of the latter is when heat from a data center is used to heat residential buildings or factories. Digital infrastructure and energy are thus becoming increasingly intertwined. The sustainable technological development of the future depends on how we can design the two together.<\/p>","protected":false},"excerpt":{"rendered":"<p>Egy chatbotnak feltett k\u00e9rd\u00e9s vagy egy vide\u00f3 lej\u00e1tsz\u00e1sa csak egy kattint\u00e1s a k\u00e9perny\u0151n. A h\u00e1tt\u00e9rben azonban hatalmas, a nap minden perc\u00e9ben m\u0171k\u00f6d\u0151 adatk\u00f6zpontok dolgoznak. A mesters\u00e9ges intelligencia t\u00e9rnyer\u00e9s\u00e9vel ezek energiaig\u00e9nye a technol\u00f3giai fejl\u0151d\u00e9s egyik legfontosabb k\u00e9rd\u00e9s\u00e9v\u00e9 v\u00e1lt. A vil\u00e1g adatk\u00f6zpontjai 2025-ben nagyj\u00e1b\u00f3l 485 terawatt\u00f3ra villamos energi\u00e1t haszn\u00e1ltak fel. Ez k\u00f6r\u00fclbel\u00fcl t\u00edzszerese Magyarorsz\u00e1g teljes \u00e9ves \u00e1ramfogyaszt\u00e1s\u00e1nak. [&hellip;]<\/p>","protected":false},"author":2,"featured_media":1717,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1714","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/posts\/1714","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/comments?post=1714"}],"version-history":[{"count":1,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/posts\/1714\/revisions"}],"predecessor-version":[{"id":1718,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/posts\/1714\/revisions\/1718"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/media\/1717"}],"wp:attachment":[{"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/media?parent=1714"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/categories?post=1714"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zsambeksciencepark.hu\/en\/wp-json\/wp\/v2\/tags?post=1714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}